Buying Guide

Buying a new-build home in Bangkok: what happens before handover

Written by Jirada Man, Founder & CEO · Last reviewed 16 October 2026
An entrance hall with a curving staircase and a chequered floor, opening into a living room.

Buying a new-build home in Bangkok usually runs in five stages: reservation, sale agreement, payments, inspection, then transfer and handover at the Land Office. The stage most buyers underestimate is the inspection. It is your best chance to have defects put right before you take ownership, so it deserves time and a trained eye.

What are the steps to buying a new-build home?

01Reservation.You choose a home and pay a reservation deposit to hold it. Ask what the deposit covers and whether any part is refundable.
02Sale and purchase agreement.This sets out the price, the payment schedule, the specification and the expected completion date. Read it carefully, ideally with a lawyer.
03Payments.For homes bought before completion, payments are usually staged. For completed homes, most of the balance is paid at transfer.
04Inspection.Before transfer, you inspect the finished home and list anything that needs fixing.
05Transfer and handover.Ownership is registered at the Land Office, fees and taxes are paid, and you receive the keys.

What is a pre-handover inspection?

It is a thorough check of the finished home before you accept it. A good inspection looks well beyond paint and tiles. It covers doors and windows, plumbing and drainage, electrical points, air conditioning, water pressure, roof and waterproofing where accessible, and the finish of each room. Each issue is photographed and listed, so the developer has a clear record to work from. For new-build homes bought from the developer through ALTO SIAM, we commission and pay for an independent third-party inspection: a second and unbiased set of eyes, and greater peace of mind.

What happens if defects are found?

The developer's team works through the list and puts the items right. You then check the work, usually in a second visit, before you sign for the home. It is normal for a new home to have a list of small items. What matters is that they are recorded clearly and fixed properly.

What warranty comes with a new home?

For condominiums, the law sets minimum warranty periods, with a longer period for the main structure than for other parts. For houses, the warranty is set in your agreement, so ask what it covers and for how long before you sign.

How long does it take?

For a completed home, reservation to keys can take a matter of weeks, depending on financing and the developer's process. For a home still being built, it depends on construction. The completion date in your agreement is the one to rely on, not a date mentioned in conversation.

What can go wrong?

A few things can go wrong with a new-build purchase. Most are manageable when you know to look for them.

  • Completion takes longer than expected. Construction dates can move, and your agreement sets out what happens if completion is late, so read that clause before you sign.
  • The finished home differs from the show home. Furniture and décor in a show home are often not included. The specification in your agreement is what you are buying.
  • Small defects are still open after you move in. Keep the signed defects list and photographs, and report anything outstanding to the developer in writing under the warranty.

Where we come in

We guide you through each step, explain the documents in plain language and keep in touch with the developer while you wait. If you are financing the purchase, we help you line up the mortgage timeline with the transfer date.

Start a conversation
Related Guide

Can foreigners buy property in Thailand?

The costs of buying a home in Thailand

Your first month after the keys

Enquire